(NASA/Goddard Space Flight Center) Just two months after the successful launch of the GOES-O spacecraft, now called GOES-14 in orbit, the NASA team removed the GOES-P spacecraft from storage and commenced its post storage testing. GOES-P is being prepared for an early March 2010 launch and if the launch schedule holds, it boasts an unprecedented two launches in approximately eight months.
1 Vote(s)
1 Vote(s)
